This was the build of 50 homes in Eye, Peterborough. Millward undertook the detailed design of S38 Roads, S278 Access and S104 drainage for the properties.
The detailed design included 3D design of the roads, external levels to all plots, surface water drainage design including permeable paving, online pipe attenuation, and off line dry basin within the public open space area. Foul drainage design for the development included design of a fully adoptable pumping station in accordance with Sewers for Adoption 6th Edition and Anglian Water adoption requirements.
The S278 highway works included a priority junction access from the existing road including carriageway tie in details.
Full detailed design drawings were produced and subsequently approved by Peterborough City Council and Anglian Water.